
2010 Seminars by Topic
- View full seminar calendar
Phase I - Survey, OH, Joint Use, Unique Structure, 9/21/2010...
Phase I - Survey, OH, Joint Use, Unique Structure, 9/22/2010...
Fundamentals of Utility Engineering - Module C, 9/28/2010...
Phase III - UG, Transformers, Protection, Contracts, 10/11/2010...
Energy Delivery Consultants
|

Field Staking Practices
Using a compass to measure angles
Using a hand level
Control points
Pole Top Assemblies
Crossarm strengths
Deadend assemblies
Maximum pin loading
Calculation of Maximum line angles
Applying the NESC Rules
Ground clearences
Grounding requirements
Clearence to buildings & signs
Guying and Anchoring
NESC loading requirements
Limitations of commonly used materials
Selecting a guy lead & attachment height
Conductors
Sag characteristics
Ruling spans
Using sag tables
Sagging conductor
Additional Design Considerations
Transformer Sizing
Secondary Voltage Drop
Selection of Poles
NESC loading requirements
Calculating wind loads
Vertical weight limits
Case Problems
Problems are worked throughout the seminar and are designed to impart realworld solutions of the common day-to-day problems.
|