
2010 Seminars by Topic
- View full seminar calendar
Phase I - Survey, OH, Joint Use, Unique Structure, 9/21/2010...
Phase I - Survey, OH, Joint Use, Unique Structure, 9/22/2010...
Fundamentals of Utility Engineering - Module C, 9/28/2010...
Phase III - UG, Transformers, Protection, Contracts, 10/11/2010...
Energy Delivery Consultants
|

Overcurrent Protection
Overcurrent protection of a distribution and subtransmission system is critical for two reasons; first, a properly designed scheme will increase the overall system reliability and second, the installation of overcurrent devices can provide safety to the public. Hi-Line's staff has experience in modeling distribution systems and calculating the impedance of various components of the system for inclusion in the model. In addition, the engineers at Hi-Line are informed on the latest products available in the industry for use in overcurrent protection schemes.
|
|Back to Practice Areas|
|